VESD Shade Structures (East Side – 9 Sites)

Bid No. 24-013 - East Side Shade Structures - 9 Sites. Scope: The installation of new shade structures at nine elementary school sites on the East Side of the district: Del Rey, Endeavour, Galileo, Green Tree, Irwin, Lomitas, Mountain View Montessori, Mojave Vista, and Sixth St. The project aims to enhance outdoor spaces by providing shaded areas, improving comfort and safety for students and staff as noted in the Contract Documents. The project includes an alternate to include umbrella structures at Montessori per the drawings included in the documents.

Bid Information

Bid Date:

8/26/2024

Due:

2:00 PM

Contact:

Abdull Najjar

Email:

anajjar@ericksonhall.com

Documents and Updates

Job Walk (non-mandatory): August 14, 2024 @ 9:00 am
Project Address: A NON-MANDATORY JOB WALK has been scheduled for this project. This job walk will be held Wednesday, August 14, 2024 at 9:00 A.M. beginning at Galileo ES (first project site) located at 15999 Warwick St., Victorville, CA 92395.

Bid Date: August 26, 2024 @ 2:00 pm

Bid Documents can be obtained through Procore or if access is needed, by contacting Abdull Najjar anajjar@ericksonhall.com

See Section “Instruction for Bidders” included in the Contract Documents.
Erickson-Hall Construction provides notice to all contractors of the adoption of SB 854, this requires subcontractors to comply with the requirements as set forth on the Department of Industrial Relations (DIR) website at http://www.dir.ca.gov/PublicWorks/publicworks.html SB 854 requires all contractors who perform public works projects must be registered with the Department of Industrial Relations. No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015), unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5.

VESD Shade Structures (West Side – 9 Sites)

Bid #24-017 – West Side Shade Structures – 9 Sites. Scope: The installation of new shade structures at nine elementary school sites on the West Side of the district: Brentwood, Challenger, Discovery, Liberty, Park View, Puesta Del Sol, Ralph Baker 21, Village and West Palms. The project aims to enhance outdoor spaces by providing shaded areas, improving comfort and safety for students and staff as noted in the Contract Documents.

Bid Information

Bid Date:

8/22/2024

Due:

2:00 PM

Contact:

Abdull Najjar

Email:

anajjar@ericksonhall.com

Documents and Updates

Job Walk (non-mandatory): August 6, 2024 @ 9:00 am
Project Address: A NON-MANDATORY JOB WALK has been scheduled for this project. This job walk will be held Tuesday, August 6, 2024 at 9:00 A.M. beginning at Brentwood ES (first project site) located at 13962 Hook Blvd., Victorville, CA 92394.

Bid Date: August 22, 2024 @ 2:00 pm

Bid Documents can be obtained through Procore or if access is needed, by contacting Abdull Najjar anajjar@ericksonhall.com

See Section “Instruction for Bidders” included in the Contract Documents.
Erickson-Hall Construction provides notice to all contractors of the adoption of SB 854, this requires subcontractors to comply with the requirements as set forth on the Department of Industrial Relations (DIR) website at http://www.dir.ca.gov/PublicWorks/publicworks.html SB 854 requires all contractors who perform public works projects must be registered with the Department of Industrial Relations. No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015), unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5.

Rancho Bernardo HS Chiller Replacement REBID

ERICKSON-HALL CONSTRUCTION CO. HAS BEEN SELECTED AS THE LEASE-LEASEBACK CONTRACTOR FOR THE REBID-RANCHO BERNARDO HS CHILLER REPLACEMENT PROJECT Scope of work to include: Replace existing central utility plant equipment including the heating hot water boilers, chillers, cooling towers and pumps. New chilled and heating hot water piping distribution system. Construction of steel support structures, covered walkways, and flatwork/landscape repairs to route pipes to point of connections.

Bid Information

Prequalification Deadline:

7/26/2024

Bid Date:

8/13/2024

Due:

2:00 PM

Contact:

Emiliano Springer

Email:

espringer@ericksonhall.com

Documents and Updates

Prequalification Deadline: July 26, 2024
Job Walk (non-mandatory): July 16, 2024 @ 8:00 am
Project Address: 13010 Paseo Lucido, San Diego, CA 92128

Bid Date: August 13, 2024 @ 2:00 pm

RFI’s Due: July 26, 2024 @ 2:00 pm, submit to Emiliano Springer espringer@ericksonhall.com Bid Documents can be obtained by contacting planroom@ericksonhall.com All bids are to be submitted to Erickson-Hall Construction Co. bids@ericksonhall.com
This project requires Prevailing Wage, and Skilled & Trained Workforce.
This project requires prequalification. Poway Unified School District requires General Contractors and certain subcontractors to be prequalified on all bond-funded Construction Contracts. The following license classifications must prequalify: A, B, C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, C-46.
Poway Unified School District uses PQBids (www.pqbids.com) to manage AB 1565 contractor registration and approvals.